The aim of this project is the development of two studies of the Castelnou combined clyce power plant: stability and main transformer inrush. The stability study will evaluate the plant performance in case of a fault or in case the tripping of a unit of the plant. The main transformer inrush study will determine the inrush current of the step-up transformer when it is connected to the Spanish power network.