This project is aimed at determining the conditions for the islanded operation of the cogeneration plant of the BP Oil refinery in Castellon. We determine the conditions that require the islanded operation and the load to be shed so the plant is supplying the loads at stable frequency and voltage.
Mailing Address: C/ Alberto Aguilera 23, 28015 Madrid, Spain
Building SM26: C/ Santa Cruz de Marcenado 26, 28015 Madrid, Spain MAP Building FR3: C/ Francisco de Ricci 3, 28015 Madrid, Spain MAP