The aim of the study is to confirm the reactive power compensation scheme proposed by Iberdrola Renovables in the Clacham Flats win farm (Scotland) form the detailed steady state simulation of the wind farm. The aim of the compensation scheme is to fulfil the requirements of the UK Grid Code.
Mailing Address: C/ Alberto Aguilera 23, 28015 Madrid, Spain
Building SM26: C/ Santa Cruz de Marcenado 26, 28015 Madrid, Spain MAP Building FR3: C/ Francisco de Ricci 3, 28015 Madrid, Spain MAP