Ph.D. Thesis Developed:
E. Lobato (2002), Gestión centralizada de restricciones técnicas en mercados eléctricos competitivos. Aplicación al caso español. Universidad Pontificia Comillas. Madrid (Spain). Supervised:
A. Ugedo (2009), Modelo de gestión integral de los recursos de generación y elaboración de la estrategia de oferta óptima en un mercado secuencial de corto plazo. Universidad Pontificia Comillas. Madrid (Spain).
F.M. Echavarren (2006), Márgenes de funcionamiento en los sistemas de energía eléctrica: cálculo y acciones para su mejora. Universidad Pontificia Comillas. Madrid (Spain). 3 Ph.D. thesis
Journal Publications
E. Saiz, J. García-González, J. Barquín, E. Lobato, "Economic assessment of the participation of wind generation in the secondary regulation market", IEEE Transactions on Power Systems. vol. 27, no. 2, pp. 866-874, May 2012.
E. Lobato, I. Egido, L. Rouco, "Monitoring frequency control in the Turkish power system", Electric Power Systems Research. vol. 84, no. 1, pp. 144-151, March 2012.
E. Saiz, E. Lobato, "Optimal voltage control by wind farms in distribution networks using regression techniques", Przeglad Elektrotechniczny. vol. 88, no. 01a, pp. 117-121, January 2012.
E. Lobato, I. Egido, L. Rouco, "Performance evaluation of ancillary services in the Turkish power system", Przeglad Elektrotechniczny. vol. 88, no. 01a, pp. 122-126, January 2012.
A. Ugedo, E. Lobato, "Application of neural networks to the management of voltage constraints in the Spanish market", International Journal of Electrical Power & Energy Systems. vol. 33, no. 7, pp. 1262-1271, September 2011.
L. Olmos, R. Cossent, E. Lobato, T. Gómez, "Barriers to the implementation of response options aimed at mitigating the impact of wind power on electricity systems", Wind Energy. vol. 14, no. 6, pp. 781-795, September 2011.
F.M. Echavarren, E. Lobato, L. Rouco, T. Gómez, "Formulation, computation and improvement of steady state security margins in power systems. Part I: theoretical framework", International Journal of Electrical Power & Energy Systems. vol. 33, no. 2, pp. 340-346, February 2011.
F.M. Echavarren, E. Lobato, L. Rouco, T. Gómez, "Formulation, computation and improvement of steady state security margins in power systems. Part II: results", International Journal of Electrical Power & Energy Systems. vol. 33, no. 2, pp. 347-358, February 2011.
E. Lobato, "La vida cotidiana y el aprendizaje", Anales de Mecánica y Electricidad. vol. LXXXVII, no. III, pp. 2-9, May 2010.
F.M. Echavarren, E. Lobato, L. Rouco, "Steady-state analysis of the effect of reactive generation limits in voltage stability", Electric Power Systems Research. vol. 79, no. 9, pp. 1292-1299, September 2009.
E. Lobato, I. Egido, L. Rouco, G. López-Camino, "An overview of ancillary services in Spain", Electric Power Systems Research. vol. 78, no. 3, pp. 515-523, March 2008.
P. Southwell, E. Lobato, WG C1.2 Members, "Maintenance of acceptable reliability in an uncertain environment", Electra. no. 235, pp. 72-86, December 2007.
E. Lobato, F.M. Echavarren, L. Rouco, A. Ugedo, "Decision trees applied to forecasting switched shunt devices within the Spanish power system", International Journal of Innovations in Energy Systems and Power. vol. 2, no. 1, pp. 6-12, June 2007.
E. Lobato, F.M. Echavarren, L. Rouco, "On the assignment of voltage control ancillary service of generators in Spain", IEEE Transactions on Power Systems. vol. 22, no. 1, pp. 367-375, February 2007.
A. Ugedo, E. Lobato, Á. Franco, L. Rouco, J. Fernández-Caro, J. Chofre Álvarez, "Strategic bidding in sequential electricity markets", IEE Proceedings-Generation Transmission and Distribution. vol. 153, no. 4, pp. 431-442, July 2006.
F.M. Echavarren, E. Lobato, L. Rouco, J.M. Rodríguez-García, "El colapso de tensión: Causas y soluciones (II/II)", Anales de Mecánica y Electricidad. vol. LXXXIII, no. II, pp. 17-22, March 2006.
F.M. Echavarren, E. Lobato, L. Rouco, "A Corrective Load Shedding Scheme to Mitigate Voltage Collapse", International Journal of Electrical Power & Energy Systems. vol. 28, no. 1, pp. 58-64, January 2006.
F.M. Echavarren, E. Lobato, L. Rouco, J.M. Rodríguez-García, "El colapso de tensión: Causas y soluciones (I/II)", Anales de Mecánica y Electricidad. vol. LXXXIII, no. I, pp. 54-62, January 2006.
F.M. Echavarren, E. Lobato, L. Rouco, "A power flow solvability identification and calculation algorithm", Electric Power Systems Research. vol. 76, no. 4, pp. 242-250, January 2006.
F.M. Echavarren, E. Lobato, L. Rouco, "Contingency Analysis: A Feasibility Identification and Calculation Algorithm", IEE Proceedings-Generation Transmission and Distribution. vol. 152, no. 5, pp. 645-652, September 2005.
E. Lobato, L. Rouco, T. Gómez, F.M. Echavarren, "Elimination of voltage violations in the Spanish electricity market: Part II: Case study", Electric Power Systems Research. vol. 75, no. 2-3, pp. 110-115, August 2005.
E. Lobato, L. Rouco, T. Gómez, F.M. Echavarren, "Elimination of voltage violations in the Spanish electricity market: Part I: Theory", Electric Power Systems Research. vol. 75, no. 2-3, pp. 99-109, August 2005.
A. Ugedo, E. Lobato, J. Peco, L. Rouco, "Decision trees applied to the management of voltage constraints in the Spanish market", IEEE Transactions on Power Systems. vol. 20, no. 2, pp. 963-972, May 2005.
E. Lobato, L. Rouco, T. Gómez, F.M. Echavarren, M.I. Navarrete, R. Casanova, G. López-Camino, "A practical approach to solve power system constraints with application to the Spanish electricity market", IEEE Transactions on Power Systems. vol. 19, no. 4, pp. 2029-2037, November 2004.
E. Lobato, L. Rouco, T. Gómez, F.M. Echavarren, M.I. Navarrete, R. Casanova, G. López-Camino, "Preventive analysis and solution of overloads in the Spanish electricity market", Electric Power Systems Research. vol. 68, no. 3, pp. 185-192, March 2004.
P. Franco, E. Lobato, L. Rouco, "Riesgo en el negocio de generación eléctrica. Gestión de la cartera de grupos (II/II) Final", Anales de Mecánica y Electricidad. vol. LXXX, no. V, pp. 9-15, September 2003.
P. Franco, E. Lobato, L. Rouco, "Riesgo en el negocio de generación eléctrica. Explotación del parque (I/II) Primera parte", Anales de Mecánica y Electricidad. vol. LXXX, no. IV, pp. 8-16, July 2003.
E. Lobato, L. Rouco, M.I. Navarrete, R. Casanova, G. López-Camino, "ARO: Una herramienta para el análisis de restricciones de operación en el mercado español de energía eléctrica", Anales de Mecánica y Electricidad. vol. LXXVIII, no. III, pp. 50-58, May 2001. 28 publications
Conference Papers
E. Lobato, F.M. Echavarren, L. Rouco, "Monitoring the reactive health of a power system", 27th Convention of Electrical and Electronics Engineers. Eilat, Israel, 14-17 November 2012
E. Lobato, L. Rouco, L. Sigrist, M. Cruz, P. Fontela, J. Magriñá, E. Moreda, "Economic assessment of providing primary reserve service with energy storage systems in isolated systems", Cigré 2012 Session 44. París, France, 27-31 August 2012
E. Lobato, P. Sánchez, E. Saiz, "Long term maintenance optimization of CCGT plants", 4th IEEE Asia-Pacific Power and Energy Engineering Conference (APPEEC 2012). ISBN: 978-1-4577-0546-5, pp. 1-4, Shanghai, China, 27-29 March 2012
E. Saiz, E. Lobato, P. Linares, "Optimal band provision by wind generation in the spanish secondary regulation market", 4th IEEE Asia-Pacific Power and Energy Engineering Conference - APPEEC 2012. ISBN: 978-1-4577-0546-5, Shanghai, China, 27-29 March 2012
I. Saboya, I. Egido, E. Lobato, L. Sigrist, "Analysis of UFLS schemes with increased wind generation in small isolated power systems", 17th Power Systems Computation Conference - PSCC'11. Estocolmo, Sweden, 22-26 August 2011
A. González, F.M. Echavarren, L. Rouco, E. Lobato, "Impact of demand-side management on transmission networks", 12th Portuguese-Spanish Conference in Electrical Engineering - XIICLEEE 2011. ISBN: 978-972-8822-23-1, Ponta Delgada, Azores, Portugal, 30 June-2 July 2011.
E. Lobato, I. Egido, L. Rouco, "Performance evaluation of ancillary services in the Turkish power system", 12th Portuguese-Spanish Conference in Electrical Engineering - XIICLEEE 2011. ISBN: 978-972-8822-23-1, Ponta Delgada, Azores, Portugal, 30 June-2 July 2011
E. Saiz, E. Lobato, "Optimal voltage control by wind farms in distribution networks using regression techniques", 12th Portuguese-Spanish Conference in Electrical Engineering - XIICLEEE 2011. ISBN: 978-972-8822-23-1, Ponta Delgada, Azores, Portugal, 30 June-2 July 2011
A. Ugedo, E. Lobato, "Validation of a strategic bidding model within the Spanish sequential electricity market", 11th International Conference on Probabilistic Methods Applied to Power Systems - PMAPS 2010. ISBN: 978-1-4244-5720-5, pp. 396-401, Singapur, Singapore, 14-17 June 2010
E. Lobato, "Mastering renewables energies by combined wind and conventional energy production in Spain", Smartgrids ERA-NET Workshop Electrosuisse. Berna, Switzerland, 16 September 2009
L. Olmos, T. Gómez, E. Lobato, R. Cossent, "Policy and Regulatory Changes for T&D networks to facilitate the integration of high shares of Wind, PV and CHP in the Supply system", 10th International Association for Energy Economics European Conference (IAEE): "Energy, Policies and Technologies for Sustainable Economies". Viena, Austria, 7-10 September 2009
L. Olmos, E. Lobato, T. Gómez, "Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks", 6th International Conference on the European Energy Market - EEM'09. Leuven, Belgium, 27-29 May 2009
E. Lobato, F.M. Echavarren, L. Rouco, "On detecting and removing undesirable reactive loop flows", XIII ERIAC - 13er Encuentro Regional Iberoamericano de CIGRE. Puerto de Iguazú, Argentina, 24-28 May 2009
A. González, F.M. Echavarren, L. Rouco, E. Lobato, M. Ordiales, S. Bañares, "Caracterización del comportamiento de la carga de las redes de transporte desde el punto de vista de la gestión activa de la demanda", XIII ERIAC - 13er Encuentro Regional Iberoamericano de CIGRE. Puerto de Iguazú, Argentina, 24-28 May 2009
F.M. Echavarren, E. Lobato, L. Rouco, M.I. Navarrete, R. Casanova, "Series temporales aplicadas a la predicción de consignas de tensión en grupos de generación en el sistema eléctrico peninsular español", XIII ERIAC - 13er Encuentro Regional Iberoamericano de CIGRE. Puerto de Iguazú, Argentina, 24-28 May 2009
E. Lobato, L. Olmos, T. Gómez, R. Cossent, F.M. Andersen, P.E. Grohnheit, P. Mancarella, P. Pudjianto, G. Strbac, A. van der Welle, F. van Oostvoorn, "Barriers in the implementation of response options aimed at mitigating unpredictability and variability of wind energy", European Wind Energy Conference - EWEC 2009. Marsella, France, 16-19 March 2009
F.M. Echavarren, L. Rouco, E. Lobato, "Total transfer capability computation and improvement in interconnected electric power systems", 16th Power Systems Computation Conference - PSCC 08. ISBN: 978-0-947649-28-9, Glasgow, Scotland, 14-18 July 2008
A. Ugedo, E. Lobato, "Generator load profiles estimation using artificial intelligence", 14th International Conference on Intelligent Systems Aplications to Power Systems (ISAP 2007). Kaohsiung, Taiwan, 4-8 November 2007
B. Cova, E. Lobato, L. Olmos, J. Karacsyoni, C. Skerk, "Methodology of estimation of future investments in interconnection capacity within the Enlarged European Union", 11th International Energy Conference & Exhibition (ENERGEX'06). Stavanger, Norway, 12-15 June 2006
F.M. Echavarren, E. Lobato, L. Rouco, "Computation and sensitivity analysis of the total transfer capability in interconnected electric power systems", 11th International Energy Conference & Exhibition (ENERGEX'06). Stavanger, Norway, 12-15 June 2006
E. Lobato, A. Ugedo, L. Rouco, F.M. Echavarren, "Decision trees applied to Spanish power systems applications", 9th International Conference on Probabilistic Methods Applied to Power Systems (PMAPS'06). ISBN: 978-91-7178-585-5, Estocolmo, Sweden, 11-15 June 2006
E. Lobato, F.M. Echavarren, L. Rouco, A. Ugedo, "Decision trees applied to forecasting switched shunt devices within the Spanish power system", Artificial Intelligence in Energy Systems and Power (AIESP 2006). Madeira, Portugal, 7-10 February 2006
E. Lobato, "Power Systems with dispersed generation", CIGRE Working Group C1-2. Atenas, Greece, 13-16 April 2005
E. Lobato, L. Rouco, F.M. Echavarren, G. López-Camino, F. Cacho, T. Domínguez, "Analysis and solution of technical constraints in the Spanish Electricity market", CIGRE Session 2004. París, France, 28 August-3 September 2004
E. Lobato, L. Rouco, T. Gómez, F.M. Echavarren, M.L. Navarrete Fernández, R. Casanova, G. López-Camino, "Hourly solution of voltage constraints in the Spanish electricity market", 2003 PES General Meeting. ISBN: 0-7803-7989-6, Toronto, Canada, 14-18 July 2003
A. Ugedo, E. Lobato, Á. Franco, L. Rouco, J. Fernández-Caro, J. de Benito, J. Chofre Álvarez, J. de la Hoz-Ardiz, "Stochastic model of residual demand curves with decision trees", 2003 PES General Meeting. ISBN: 0-7803-7989-6, Toronto, Canada, 14-18 July 2003
F.M. Echavarren, E. Lobato, L. Rouco, M.I. Navarrete, R. Casanova, G. López, F. Cacho, M. Pézic, "A least-squares approach to estimate Lagrange multipliers in a combined method to voltages collapse detection", 8ª Jornadas Hispano-lusas de Ingeniería Eléctrica. ISBN: 972-8822-00-6, Algarve,Vilamoura, Portugal, 3-5 July 2003
E. Lobato, F.M. Echavarren, L. Rouco, M.L. Navarrete Fernández, R. Casanova, G. López-Camino, "A mixed-integer LP-based network topology optimization algorithm for overload alleviation", IEEE PowerTech 2003. ISBN: 0-7803-7967-5, Bolonia, Italy, 23-26 June 2003
Á. Franco, E. Lobato, L. Rouco, A. Ugedo, J. Fernández-Caro, J. de Benito, J. Chofre Álvarez, J. de la Hoz-Ardiz, "Optimization of the Spanish market sequence by a price-taker generating firm", IEEE PowerTech 2003. ISBN: 0-7803-7967-5, Bolonia, Italy, 23-26 June 2003
F.M. Echavarren, E. Lobato, L. Rouco, M.I. Navarrete, R. Casanova, G. López, "A load shedding algorithm for improvement of load margin to voltage collapse", IEEE PowerTech 2003. ISBN: 0-7803-7967-5, Bolonia, Italy, 23-26 June 2003
E. Lobato, L. Rouco, T. Gómez, F.M. Echavarren, M.L. Navarrete Fernández, R. Casanova, G. López-Camino, "Solution of daily voltage constraints in the Spanish Electricity Market", 14th PSCC - Power Systems Computing Conference. ISBN: 84-89673-25-X, Sevilla, Spain, 24-28 June 2002
E. Lobato, L. Rouco, M.I. Navarrete, R. Casanova, G. López, "An LP-based optimal power flow for transmission losses and generator reactive margins minimization", IEEE Power Tech. Conference. ISBN: 0-7803-7139-9, Oporto, Portugal, 10-13 September 2001
E. Lobato, L. Rouco, M.I. Navarrete, R. Casanova, G. López-Camino, "Aplicación práctica de un despacho preventivo de activa: Redespacho de generación efectivos y de compensación", 7as Jornadas hispano-lusas de ingenieria eléctrica. Vol: II pp. 189-193. ISBN: 84-95821-00-1, Madrid, Spain, 4-6 July 2001
E. Lobato, L. Rouco, M.I. Navarrete, R. Casanova, G. López, J. García Castillejo, "An Integrated Tool for Analysis of Power System Constraints in the Spanish Electricity Market", 2000 IEEE/PES Summer Meeting. pp. 1627-1632. ISBN: 0-7803-6420-1, Seattle, Washington, U.S.A., 16-20 July 2000
A. Barrado, E. Lobato, J. Peco, L. Rouco, "A power generation redispatch algorithm for competitive electricity markets", UPEC'99: 34th Universities Power Engineering Conference. ISBN: 978-1898489115, Leicester, United Kingdom, 14-16 September 1999
E. Lobato, L. Rouco, M.I. Navarrete, G. López-Camino, "Un algoritmo heurístico de despacho preventivo de potencia activa", 6ª Jornadas Hispano-Lusas de Ingeniería Eléctrica. ISBN: 84-920984-2-2, Lisboa, Portugal, 7-9 July 1999
36 publications
Books and Book chapters 1 books
Projects
Maintenance and new capabilities of Eon Tools 2013 to 2014, developed for: Eon Generación, S. L.
Apr/2013-Mar/2014
Grid Integration of Compressed Air Energy Storage systems (CAES), developed for: ENDESA.
Oct/2012-Jul/2013
Maintenance and new capabilities of Eon Tools 2012 to 2013. Economic assessment of Eon AGC (automatic generation control) system, developed for: Eon Generacion, S. L.
Apr/2012-Mar/2013
Reviewing and updating of the hc operation proceedings for constraints management in the hv distribution network, developed for: HC Energía S.A..
Oct/2011-Apr/2012
Maintenance and new capabilities of Eon Tools 2011 to 2012, developed for: E.ON Generación S.L.
Apr/2011-May/2012
Transmission system operation with large penetration of wind and other renewable electricity sources in networks by means of innovative tools and Integrated Energy Solutions, developed for: Comisión Europea.
Apr/2010-Sep/2013
STORE: demostration project on energy storage technologies, developed for: Endesa.
Dec/2009-Dec/2012
Feasibility study for establishing a central monitoring system for ancillary services in the Turkish electricity market, developed for: Mercados EMI.
Sep/2009-Jul/2010
Maintenance and new capabilities for Viesgo Tools 2009 a 2010, developed for: Eon España.
Mar/2009-Mar/2011
Active and Reactive power control in wind generation, developed for: Acciona Energía S.A..
Sep/2008-Oct/2009
Islanded operation of BP Oil cogeneration plant, developed for: Iberdrola Ingeniería y Construcción.
Jul/2008-Apr/2009
Maintenance and new capabilities for Viesgo Tools 2008, developed for: Viesgo.
May/2008-Nov/2008
The hydro generation in the secondary reserve and load following service, developed for: Iberdrola.
Apr/2008-May/2008
Active management of demand, developed for: REE (Red Eléctrica de España).
Jul/2007-Dec/2009
Power system studies of the IPP Mesaieed, developed for: Iberdrola Ingeniería y Consultoría.
Jul/2007-Jan/2008
Future scenarios within the Framework DENISE (Intelligent, Secure and Efficient distribution of electricity), developed for: Endesa Servicios.
Apr/2007-Mar/2008
Power system stability study of the Riga TPP-2 combined cycle power plant , developed for: Iberdrola Ingeniería y Consultoría.
Apr/2007-May/2007
New capabilities for Viesgo Tools 2007, developed for: Viesgo.
Apr/2007-May/2008
Power system stability study of the Ludwigsau combined cycle power plant , developed for: Iberdrola Ingeniería y Consultoría.
Mar/2007-Apr/2007
Maintenance and development of new capabilities of ARO, ARO-OPF, ESAF and ESLA in 2007, developed for: Indra.
Jan/2007-Dec/2007
Renewable electricity supply interactions with conventional power generation, networks and demand, developed for: Comisión Europea.
Jan/2007-Jul/2009
Maintenance and development of new capabilities of ARO, ARO-OPF, ESAF and ESLA, developed for: Indra.
Sep/2006-Jul/2007
New capabilities for Viesgo Tools 2006, developed for: Viesgo.
Apr/2006-Mar/2007
Evaluation of proposals to the NOVARE awards in R&D in energy, developed for: Endesa.
Jan/2006-Feb/2006
Tools for power system operation and power system operation planning, developed for: Indra.
Sep/2005-Jul/2006
Development of the bidding modules of Electrabel Energy Management System, developed for: Atos Origin.
Jul/2005-Jun/2006
New capabilities for Viesgo Tools 2005, developed for: Viesgo.
Apr/2005-Mar/2006
Maintenance for Viesgo Tools 2005, developed for: Viesgo.
Apr/2005-Mar/2006
Update of the transmission costs for the transmission company in Bolivia, developed for: Transportadora de Electricidad de Bolivia.
Feb/2005-Mar/2005
Contribution of the coal fired power plants to the security of the Spanish power system, developed for: Grupo SAMCA.
Feb/2005-Feb/2005
Energy infrastructure cost and investments between 1996 and 2023 on the Trans-European Energy Network., developed for: Comisión Europea (DG TREN).
Jan/2005-Oct/2005
Transmission costs assessment for the transmission company in Bolivia, developed for: Transportadora de Electricidad de Bolivia.
Sep/2004-Oct/2004
Tools for power system operation and power system operation planning, developed for: Indra.
Sep/2004-Jul/2005
Maintenance and new developments for Viesgo Tools, developed for: Viesgo.
Apr/2004-Mar/2005
Studies of power system constraints and load-frequency regulation of Cepsa cogeneration plants, developed for: Cepsa.
Nov/2003-Dec/2003
Manteinance and new capabilities of the system for analysis of power system constraints, developed for: Indra.
Sep/2003-Jul/2004
Manteinance and new developments for Viesgo Tools, developed for: Viesgo.
Mar/2003-Feb/2004
Manteinance and new developments for Viesgo Tools, developed for: Viesgo.
Mar/2003-Feb/2004
Not Available, developed for: Viesgo.
Oct/2002-Dec/2002
Optimization of the solution of power system constraints and voltage control: Phase II, developed for: Indra.
Sep/2002-Jul/2003
Integrated resources management in the electricity market with daily scope, developed for: Viesgo.
Jan/2002-Dec/2002
Integrated resources management in the electricity market with weekly scope, developed for: Viesgo.
Jan/2002-Dec/2002
Optimization of the solution of power system constraints and voltage control, developed for: Indra.
May/2001-Mar/2002
Not Available, developed for: OIKOS MINOR Y ASOCIADOS.
Oct/2000-Oct/2000
Analysis of power system operation constraints: Phase II, developed for: REE (Red Eléctrica de España), en colaboración con Indra SSI.
Nov/1998-Sep/2000
Power system studies, developed for: Endesa.
Sep/1997-Aug/1998
46 projects
Generate CV in Comillas/CICYT format |
|
Mailing Address: C/ Alberto Aguilera 23, 28015 Madrid, Spain
Building SM26: C/ Santa Cruz de Marcenado 26, 28015 Madrid, Spain MAP Building FR3: C/ Francisco de Ricci 3, 28015 Madrid, Spain MAP |